Results:
Tag: U.S. Army
Clear
  • Notice of Availability: Draft Finding of No Significant Impact and Draft Environmental Assessment

    Expiration date: 5/16/2022

    The United States Army is publishing this notice to announce the availability of the Draft Finding of No Significant Impact and Draft Environmental Assessment (EA) to make upgrades to the existing river water reservoir and outfall 40 cooling water channel at Holston Army Ammunition Plant (HSAAP) in Kingsport, Tennessee. The proposed action is needed to ensure safe and environmentally compliant manufacturing operations at HSAAP. This notice complies with Section 2(a)(4) of EO 11988 and Section 2(b) of EO 11990. The Army requests public comment to determine if there are any public concerns regarding the project’s potential impacts on wetlands and floodplains. The public comment period ends May 16, 2022.

  • Clean Water Act Interpretive Rule for 404(f)(1)(A) Withdrawal

    This is a public notice regarding the withdrawal of the Clean Water Act Interpretive Rule, and to help inform the public and agricultural, ranching, and silvicultural communities of the withdrawal. The U.S. Army Corps of Engineers want to make clear to the public that the statutory exemption of 404(f)(1)(A) still remains available for use when applicable for discharges of dredged and/or fill material associated with normal farming, silviculture, and ranching activities that are part of an established operation. Withdrawal date: Jan. 29, 2015.
  • EA for Millennium Area Headstone Removal Project

    Expiration date: 12/7/2012

    This Environmental Assessment was prepared to assess the potential impacts of the Millennium Area Headstone Removal Project on property administered by Arlington National Military Cemeteries and National Park Service property at Arlington County, Va. The purpose of the project is to remove all headstones being currently used as stream stabilization within ANC and NPS-administered property, while providing stabilization measures adequate to ensure that the system is not degraded. This project would remove the headstones and dispose of them properly. Public comment period ends Nov. 2, 2012.