Results:
Tag: Rapidan River
Clear
  • NAO-2016-0633

    Expiration date: 9/2/2017

    The proposed 110-acre Montebello Mitigation Bank is located on a 680-acre tract on Montebello Road in Orange County, VA. The Bank site is located along the headwaters of the Rapidan River and several tributaries to the Rapidan River. The Sponsor plans to reestablish streambanks and enhance the natural, wider riparian corridor to 200-feet in width along 6,078 linear feet of perennial and intermittent tributaries and restoration, enhancement and preservation of 7.27 acres of wetlands within the bank site. The purpose is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to streams and wetland loss in waters of the United States within the Rapidan – Upper Rappahannock HUC 02080103 watershed and a portion of Lower Rappahannock River Basin HUC 02080104.
  • NAO-2012-771

    Expiration date: 2/12/2014

    The bank sponsor proposes to establish, design, construct, and operate a compensatory stream and wetland mitigation bank to be known as Potato Run Mitigation Bank The purpose of the mitigation bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to wetlands and other Waters of the United States in the Rapidan Drainage basin. The goal of the bank is to provide mitigation credits for unavoidable impacts to Waters within the authorized service area.