Results:
Tag: Compensatory Mitigation
Clear
  • NAO-2023-02174 (Hogans Belt Mitigation Bank, Loudoun County, Virginia)

    Expiration date: 5/11/2024

    The Sponsor proposes to design, construct, establish, and operate Hogans Belt Mitigation Bank (Bank). The sponsor is proposing 35.03 wetland credits be generated through wetland creation (22.6 acres), wetland enhancement (24.7 acres), wetland preservation (1 acre), upland buffer reforestation (25.9 acres), and forest preservation (7.1 acres) across two project areas. The purpose of the Bank is to provide off-site compensatory mitigation for projects that result in unavoidable impacts to waters of the U.S. including wetlands. Comments should be received by the close of business on May 11, 2024.
  • NAO-2021-00207 (Buchanan Minerals Impoundment, Buchanan County, Virginia)

    Expiration date: 9/17/2023

    PROJECT DESCRIPTION AND PURPOSE:  Construct a freshwater impoundment for the retention and delivery of sufficient quality and quantity of water to the adjacent coal preparation plant to facilitate continued coal extraction/recovery of metallurgical bituminous coal from the existing underground Buchanan No. 1 mine for an anticipated 25-years.  The proposed impoundment is planned to provide for 96-acre-feet of storage and the applicant anticipates that it would provide 2,400 gallons per minute, or approximately 3.5 million gallons per day of freshwater, for processing raw material for a targeted annual output of 1-2 million tons of cleaned coal.  Construction of the impoundment would permanently impact approximately 1,340 linear feet of Garden Creek.  Specifically,  the construction of the dam would result in a permanent loss of 480 linear feet of streambed and the subsequent backfilling of Garden Creek would result in a permanent conversion of 860 linear feet of stream habitat to open water habitat.

  • Third-Party Compensatory Mitigation Site Monitoring Report Template

    Expiration date: 5/12/2023

    The U.S. Army Corps of Engineers (USACE), Norfolk District and the Virginia Department of Environmental Quality (DEQ) announce the release of the 2023 Monitoring Report Template for use in the Commonwealth of Virginia.
  • NAO-2023-00248 (Field of Streams Mitigation Bank, Fauquier, Virginia)

    Expiration date: 3/17/2023

    Abundance Mitigation, LLC proposes to construct and operate a compensatory stream and wetland mitigation bank in Fauquier County, VA.
  • NAO-2022-02783 (Rapidan Mill Mitigation Bank, Orange County, Virginia)

    Expiration date: 3/6/2023

    Ecotone, LLC propose to construct a compensatory mitigation bank in Orange County, VA by removing the Rapidan Mill Dam. Public comments should be received by the close of business on March 6, 2023.