The Norfolk District, U.S. Army Corps of Engineers, will conduct a pulse release at Gathright Dam, near Covington, Va., on Wednesday, 12 October 2022, beginning at approximately 6 a.m.
Water releases will gradually increase and peak at 3,500 cubic feet per second by 9 a.m. The maximum surge will last two hours, begin to gradually decrease at 11 a.m., and return to approximately 220 cfs by 1:30 p.m. The pulse is expected to cause river fluctuations and may raise the water level downstream in the Jackson River by up to five feet in some sections and up to three and a half feet in the upper James River, but will remain several feet below flood stage. In some areas, the rate of the river rise may exceed two feet per hour.
Releases from Gathright Dam are normally at a constant height and flow during this time of year. The pulse release will help control algae growth and improve water quality and habitat in the lower Jackson River.
This concludes the scheduled pulse releases for the year 2022.
The pulse releases are part of the Low Flow Augmentation project purpose for the Gathright Dam and Lake Moomaw Project to improve the overall water quality and ecological resources in the lower Jackson River. The series of pulses was developed, in cooperation with the Virginia Department of Environmental Quality and the Virginia Department of Wildlife Resources.
For question related to Gathright Dam, please contact Gathrightdam@usace.army.mil.